chore(canary-phase-ui-design): UI design layer complete
Operator-directed UI design phase complete. Frontend now renders the full public-facing canary surface from the white-canvas (1d205c17) baseline, built from the vector-minimalism design ethos at operator's invocation. Shipped (4 commits, 1d205c17..HEAD): -f5d893abfeat: design tokens (paper/ink/alarm/signal palette, paper-grain + halftone data-URIs, hairline width) + 12 primitives (Strip, SpecimenCard, DataRow, Pill, CopyField, Halftone, SerialBar, Glyph×7, Field, Button) -5562f82ffeat: landing — specimen requisition page + Turnstile widget -4a4f465dfeat: manage dossier + /m/:manageId + 404 fallback -da126ad8fix: audit findings (URL revoke + eventExtra schema + form primitives consolidation + Glyph exhaustiveness + dead code removal) Pages live: GET / (intake), GET /m/:manageId (dossier), * (NotFound). All 7 token types renderable. Both alert channels covered. Cursor pagination on the event log. Two-step delete confirmation. Turnstile invisible challenge when VITE_TURNSTILE_SITE_KEY is set; dev-mode bypass-safe when not. Audited: superpowers:code-reviewer (PASS-WITH-NOTES) + general-purpose spec adherence (PASS). Both audits' actionable findings cleared inda126ad8per the fix-in-phase rule (no BACKLOG entries opened). Gates green: pnpm typecheck + biome check + lint:scss + build (414ms, landing 19.9KB/6.8KB gzip, manage 10.9KB/3.7KB gzip, notfound 1.0KB/0.5KB gzip, components 9.2KB/2.8KB gzip). Phase 14 operator-pause boundary explicitly waived for this phase by the operator. The literal Phase 15 (nginx + Dockerfile + telemetry, plan line 2320) was not started and remains queued.
This commit is contained in:
parent
da126ad889
commit
2f73e37a61