MicroFish/.kiro/specs
Dominik Seemann 339cc396dd chore(i18n): refresh cjk baseline and update spec status
backend/app baseline drops from 2792 to 307 after the comment/docstring
translation pass. Mark i18n-translate-backend-comments tasks complete in
the spec and update HANDOFF.md to record the second-installment scope.
Add the AST-aware scanner used during verification under the spec
directory so future audits can re-run it.
2026-05-09 10:59:51 +00:00
..
graphiti-neo4j-finalize feat(graphiti): finalize neo4j migration with provider switch 2026-05-07 08:43:36 +00:00
graphiti-ollama-embedder fix(graphiti): surface embedding failures and document ollama embedder 2026-05-07 20:39:42 +00:00
i18n-backfill-zh-json fix(i18n): backfill english-only entries in zh.json 2026-05-07 15:32:30 +00:00
i18n-ci-guard chore(i18n): refresh cjk baseline and update spec status 2026-05-09 10:59:51 +00:00
i18n-e2e-english-verification chore(i18n): add e2e english verification spec, audit, and report 2026-05-07 18:44:13 +00:00
i18n-externalize-backend-logs feat(i18n): externalize chinese log and api response strings 2026-05-07 13:52:22 +00:00
i18n-externalize-remaining-backend-logs fix(i18n): externalize remaining chinese backend log strings 2026-05-07 22:40:18 +00:00
i18n-frontend-comments docs(i18n): translate chinese comments in frontend src to english 2026-05-07 17:42:05 +00:00
i18n-oasis-profile-generator-prompts feat(i18n): translate oasis_profile_generator prompts to english 2026-05-08 05:44:00 +00:00
i18n-ontology-generator-prompts feat(i18n): translate ontology_generator prompts to english 2026-05-07 09:40:27 +00:00
i18n-readme-tagline-and-assets docs(i18n): translate readme tagline and rename chinese assets 2026-05-07 19:39:30 +00:00
i18n-report-agent-prompts feat(i18n): translate report_agent react prompts to english 2026-05-07 12:49:23 +00:00
i18n-simulation-config-generator-prompts feat(i18n): translate simulation_config_generator prompts to english 2026-05-07 11:43:47 +00:00
i18n-translate-backend-comments chore(i18n): refresh cjk baseline and update spec status 2026-05-09 10:59:51 +00:00