Follow-up to the salvaged start-order gate bound. Two gaps remained, both
reachable through the same knob.
1. The gate bound ignored the batch deadline it sits under. With
HERMES_CONCURRENT_TOOL_TIMEOUT_S below 120s the deadline fired first, so
the parked tools were still reported as "timed out" without ever running --
the exact bug the bound exists to fix. The gate now clamps to
min(120s, batch_timeout / 2), matching the sibling constant's documented
habit of relating the two timeouts.
2. A gate-parked worker released purely by its own timeout could wake up after
the batch was abandoned and dispatch its tool anyway: wasted work whose
result nobody reads, a duplicate post_tool_call for a tool_call_id the turn
already closed as timeout, and agent._current_tool left pointing at a dead
tool for the rest of the session (the main thread's reset already ran).
Abandonment is now a first-class wakeup: both abandon sites set an event and
notify the condition, and a released worker raises _BatchAbandoned instead
of dispatching. Parked threads are reclaimed in milliseconds rather than one
full gate timeout plus a tool runtime.
Also names the tool in the gate-timeout warning. The closure's function_name
binds the last-parsed tool, so logging it directly would have printed the wrong
name; it is threaded through _begin_in_order instead.
Measured, 3-tool batch with the first tool wedged during dispatch:
main PR as-is with this commit
dispatched in batch 0 0 tool_b, tool_c
dispatched after return 0 2 (ghost) 0
_current_tool leaked no "tool_b" no
Adds tests/run_agent/test_start_order_gate.py (3 tests). Mutation-checked
against the parent commit: the starvation guard passes there (it binds the
salvaged fix), while the deadline-clamp and abandonment guards both fail,
reproducing the ghost dispatch as
"tool(s) dispatched after the batch was abandoned: [tool_a, tool_b]".