paperclip/.github/workflows
Devin Foley bb85e59ccb ci: measure the final five-server and three-chat matrix
Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-09-10 20:02:57 -07:00
..
agent-runtime-images.yml build(deps): bump actions/checkout from 6 to 7 (#8461) 2026-06-23 10:13:39 -07:00
commitperclip-review.yml fix(build): enforce Node 24 across Paperclip (#11792) 2026-08-21 10:17:52 -07:00
docker.yml ci(docker): build each architecture on a native runner instead of QEMU (#12821) 2026-09-09 15:56:28 -07:00
e2e.yml test(runner): add full-stack acceptance and eval gates (#12700) 2026-09-02 08:55:08 -05:00
pr-trusted.yml ci: split runner verification from build (#13142) 2026-09-10 01:18:06 -07:00
pr.yml ci: activate the Docker context integrity gate for PRs (#12860) 2026-09-04 17:22:15 -07:00
refresh-lockfile.yml ci: harden paid runner browser and lock repair (#12829) 2026-09-04 08:58:44 -05:00
release-smoke.yml Follow the current onboarding arc in the release smoke (#12423) 2026-08-28 07:21:08 -07:00
release-verify.yml ci: balance remaining server suites with measured native Runner cost 2026-09-10 20:02:23 -07:00
release.yml ci: measure the final five-server and three-chat matrix 2026-09-10 20:02:57 -07:00
runner-chaos-evals.yml test(runner): add full-stack acceptance and eval gates (#12700) 2026-09-02 08:55:08 -05:00
runner-full-stack-e2e.yml test(e2e): link runner campaign summaries (#12927) 2026-09-06 09:09:51 -05:00
runner-live-evals.yml feat(runner): restore direct live eval campaigns and reports (#12909) 2026-09-05 20:18:11 -05:00
runner-protocol-live-evals.yml fix(evals): make the chat viewer the default published Evalbook (#12952) 2026-09-07 07:47:17 -05:00
storybook-visual.yml build(deps): bump actions/setup-node from 6 to 7 (#9884) 2026-07-21 12:04:06 -05:00